Industries Old and mixed estates
Every generation of gear, in one synthetic twin.
Mergers and local fixes leave estates no single drawing describes.

What goes wrong
No single drawing covers it.
- 01
Inherited sites
After a merger, nobody is quite sure how the new sites are built.
- 02
Many suppliers, many eras
Gear from different suppliers and generations runs side by side.
- 03
Records out of date
Drawings and spreadsheets describe the estate as it was.
Where RKR SETU comes in
Ahead of the first change on inherited sites.
Old, mixed and multi-vendor in one model
Build the twin from configs, exports, drawings and floor plans together.
Many sites side by side
Generate the whole estate and spot the sites that differ.
Network and power together
Follow wired gear back to the power that feeds it.
With RKR Nala

Outcomes
Fewer surprises across the estate.
- Less rework after mergers
- Fewer surprises during refreshes
- Shorter change windows
See RKR SETU on an estate like yours.
Demos are in person. Book a demo with our team: sales@rkr-networks.com