Know what a breaker takes down before you open the panel.

Power, cooling, racks and the fabric in one synthetic twin.

A modelled data hall with rack rows, one rack group highlighted
What goes wrong

Power, cooling and the fabric meet here.

  1. 01

    One feed carries everything

    During planned work, a second fault has nowhere to go.

  2. 02

    Facilities and network apart

    A cooling event becomes a network outage nobody planned for.

  3. 03

    Alarm floods

    Dozens of alarms arrive at once and hide the one thing that failed.

Where RKR SETU comes in

Ahead of maintenance and build-out.

  1. Maintenance and second faults previewed

    See what would drop before the work starts. Nothing changes while you look.

    With RKR Nala
Close view of modelled racks in RKR Nala, with the racks that lost power outlined in red
Outcomes

Maintenance with fewer surprises.

  • Fewer unplanned outages in maintenance
  • Shorter maintenance windows
  • Less rework between facilities and network